CONSTRUCTION UPDATES

Although Broadway Hills Estates is nearly sold out, please fill out the Contact Us for information on our next subdivision coming to the North Side of Appleton later 2021/early 2022

IMG_7745.jpg

COMPLETED!!

12-21-20

The installation of survey irons on property corners and lot line markers complete construction of Broadway Hills Estates!

IMG_8008.JPG

LET THERE BE LIGHT!

12-15-20

After testing of the new utilities was completed and passed, the utilities were energized and the previously dark field was illumiated with its new LED street lights

IMG_7747.jpg

UTILITY INSTALL

12-5-20

Light poles, transformers, power, gas and cable are installed along both sides of Snowdrift Dr

IMG_7448.JPG

UTILITY INSTALL PREP

11-15-20

Light poles, transformers and utility trenches are marked as the site is prepped for utility install

IMG_7338.JPG

SEEDING

11-9-20

Lots 1-4, 10-12, right of ways and surrounding areas are seeded as final grading is completed

IMG_7137.JPG

UTILITY PRECON WALK

10-29-20

Members from Martenson & Eisle, Michels, & @ WE Energies complete a pre-construction walk of the utility route on a bitterly cold and windy day prior to installing electric, gas and cable utilities.

IMG_7086.JPG

SNOWDRIFT ON SNOWDRIFT DR?

10-26-20

A relatively early season snow covers Snowdrift Dr and the remainder of Broadway Hills Estates as final road and lot grading near completion

IMG_7049.JPG

THE PONDS FILL QUICKLY

10-24-20

The North pond raises roughly 4' in 24 hours to its designed water level after a cold fall storm dumps nearly 3.5" of rain on NE Wisconsin

IMG_7015.JPG

NORTH POND COMPLETION

10-22-20

The North pond is brought to final grade, fertilized, seeded and covered in erosion control matting in advance of a predicted heavy fall rain

IMG_7022.JPG

A THROUGH STREET!

10-22-20

Snowdrift Dr is covered in gravel from French Rd thru to Broadway Dr for the first time!

IMG_7026.JPG

COMPLETION OF SOUTH POND

10-16-20

The South pond passes final inspection, is covered with top soil, seeded and covered in erosion control matting

IMG_6873.JPG

ROAD BUILDING

10-12-20

The road base of Snowdrift Dr is installed in front of the North pond down to lots 7-12

IMG_6644.JPG

LOT GRADING

10-10-20

Thousands of yards of fill are hauled in, spread and graded on lots 1-3

IMG_6844.JPG

LOT GRADING

10-9-20

Lots16-18 are leveled, compacted and brought to final grade

IMG_6774.JPG

MOUNTAINS OF FILL

10-7-20

Some of the 50,000+ yards of clay fill awaits grading on lots 16-18

IMG_6772.JPG

NORTH POND CONSTRUCTION

10-7-20

Construction on the North pond begins

IMG_6688.JPG

SOUTH POND CONSTRUCTION

9-30-20

South Pond main excavation is completed and ready to install clay liner

IMG_6648.JPG

SOUTH POND CONSTRUCTION

9-30-20

Bowers & Sons Construction team makes good headway digging the South Pond

IMG_6628.JPG

STARTING SOUTH POND

9-29-20

Bowers & Sons Construction pumps surface water off and makes final preparations before digging the South pond

IMG_6624.PNG

TRUCK PARADE

9-28-20

A parade of dump trucks works on French Rd hauling in 40,000+ yards of clay fill to raise the grade of Snowdrift Dr and the Southern most six lots of Broadway Hills Estates

IMG_6607.JPG

STORM SEWER INSTALL

9-28-20

Storm sewer lateral installation in thick mud heading North on the East side of Lots 16-18.

IMG_6537.JPG

STORM SEWER INSTALL

9-24-20

Storm sewer installation heading North on Snowdrift Dr in front of Lot #2.  Trucks hauling fill in the background to raise level of the road and Southern six lots.

IMG_6524.JPG

STORM SEWER INSTALL

9-23-20

Storm sewer installation on the South lot line of Lot #18 and Broadway Dr

IMG_6482.JPG

WATER MAIN INSTALLED ON SNOWDRIFT DR

9-18-20

Water main and hydrants installed along Snowdrift Drive

IMG_6430.JPG

NORTH POND AREA

9-17-20

View of the North pond. Top Soil has been stripped and ready for excavation around Oct 8th.

IMG_6437.JPG

SOUTH POND AREA/LOT #19

9-17-20

View of the South pond and part of Lot #19. Top Soil has been stripped and ready for excavation around Oct 1st.

IMG_6434.JPG

SNOWDRIFT DR

9-16-20

Snowdrift Drive has sanitary sewer installed, blue flags on the left (East) side of the road mark the water main to be installed over the next week

IMG_6400.JPG

INSTALLING SANITARY SEWER

9-15-20

Bowers & Sons employees installing sanitary sewer in front of lot #9 & 13 in Snowdrift Dr, 27' below ground!